The Rockstar Game
»
The Rockstar Game Related
»
Game Discussion & Help
»
does anyone know the producer costs for albums and singles?
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
this would be a great idea for a FAQ.
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 10/07/2009(UTC) Posts: 159 Location: Glasgow
|
It depends on how many points you spend on recording the album.
The more points you spend, the higher the cost increases, to represent the increased cost of spending longer in the studio I would assume. |
The artist formerly known as forkboy |
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
yeah. i know it varies. i've only released 1 single, and if i recall correctly it costs £1,000,000 for the top producer at max points (35).
how much is it for the top producer when releasing an album using the max 150 points?
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 12/02/2009(UTC) Posts: 1,529 Location: Give me more sunliiiiiight!
Thanks: 4 times Was thanked: 31 time(s) in 23 post(s)
|
It costs 1.5 million at maximum points for an album |
_____________ The Black Gates- Progressive technical metal The Infidels!- Retro doom funk grindcore The Graveyard Sluts- dirty, slutty rawwwwk Psycopathologist- old school death grind Everyone is entitled to an opinion, it's just that your's is stupid. |
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 10/07/2009(UTC) Posts: 159 Location: Glasgow
|
A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain |
The artist formerly known as forkboy |
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option.
|
|
|
|
Rank: Advanced Member
Groups: Moderators, Registered Joined: 13/02/2009(UTC) Posts: 3,094 Location: Probably not here Was thanked: 113 time(s) in 76 post(s)
|
PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. |
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 10/07/2009(UTC) Posts: 159 Location: Glasgow
|
An album is well over £1m. I'm sure it's nearer £1.5m |
The artist formerly known as forkboy |
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much.
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 16/02/2009(UTC) Posts: 2,543 Location: Jamaica Thanks: 27 times Was thanked: 34 time(s) in 28 post(s)
|
PatagonianFox wrote:Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much. You cant cant charge £99 per concert when you sell out small clubs? You can enter the number, but it doenst charge that much |
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 23/06/2009(UTC) Posts: 79
|
Aj wrote:PatagonianFox wrote:Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much. You cant cant charge £99 per concert when you sell out small clubs? You can enter the number, but it doenst charge that much yes you can. i read about it on this forum, and have been doing it ever since.
|
|
|
|
Rank: Advanced Member
Groups: Moderators, Registered Joined: 13/02/2009(UTC) Posts: 3,094 Location: Probably not here Was thanked: 113 time(s) in 76 post(s)
|
PatagonianFox wrote:Aj wrote:PatagonianFox wrote:Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much. You cant cant charge £99 per concert when you sell out small clubs? You can enter the number, but it doenst charge that much yes you can. i read about it on this forum, and have been doing it ever since. Yeah but it doesn't actually charge 99 for each gig, it just charges the maximum available. |
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 16/02/2009(UTC) Posts: 2,543 Location: Jamaica Thanks: 27 times Was thanked: 34 time(s) in 28 post(s)
|
PatagonianFox wrote:Aj wrote:PatagonianFox wrote:Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much. You cant cant charge £99 per concert when you sell out small clubs? You can enter the number, but it doenst charge that much yes you can. i read about it on this forum, and have been doing it ever since. My point exactly :) |
|
|
|
|
Rank: Advanced Member
Groups: Registered
Joined: 10/07/2009(UTC) Posts: 159 Location: Glasgow
|
PatagonianFox wrote:Gildermershina wrote:PatagonianFox wrote:cam wrote:A single with max points (35) costs £350,000.
So obviously at max points each point costs £10,000. Don't know if that still applied at less than full points, I have to be honest. And I think that as you take each step down the ladder in the production scale the next producer costs 10% less. I THINK. I'm not totally certain i don't think thats true. when i recorded my one and only single the top producer cost £1,000,000. i had to use Rubber Johnny, because i didn't have enough cash for a better producer. my single with max points consisting of 3 songs all rated above 95 was released with an 87 rating. i know i had at least £350,000, and i would have spent it on a better producer had it been an option. That's wrong, albums are 1 mil, singles 350k. then call it a bug. i've been charging £99 per concert ticket since i was playing small clubs. i had well over £350,000, and could have easily afforded a better producer had it not costed so much. Of course it's a bug. You have played this game right? |
The artist formerly known as forkboy |
|
|
|
The Rockstar Game
»
The Rockstar Game Related
»
Game Discussion & Help
»
does anyone know the producer costs for albums and singles?
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.